翻訳と辞書
Words near each other
・ 3alpha,7alpha,12alpha-trihydroxy-5beta-cholest-24-enoyl-CoA hydratase
・ 3alpha,7alpha,12alpha-trihydroxy-5beta-cholestanoyl-CoA 24-hydroxylase
・ 3alpha,7alpha,12alpha-trihydroxycholestan-26-al 26-oxidoreductase
・ 3alpha-hydroxy-5beta-androstane-17-one 3alpha-dehydrogenase
・ 3alpha-hydroxycholanate dehydrogenase
・ 3alpha-hydroxyglycyrrhetinate dehydrogenase
・ 3alpha-hydroxysteroid dehydrogenase (A-specific)
・ 3alpha-hydroxysteroid dehydrogenase (B-specific)
・ 3AM (Kleerup song)
・ 3AM (Matchbox Twenty song)
・ 3APL
・ 3Arena
・ 398th Fighter-Interceptor Squadron
・ 399
・ 399 BC
399 Fremont Street
・ 399 Park Avenue
・ 399 Persephone
・ 3993 Šorm
・ 3999 Aristarchus
・ 399th Bombardment Group
・ 39Galaxyz
・ 39M Csaba
・ 39P/Oterma
・ 39th (Dorsetshire) Regiment of Foot
・ 39th (Personnel Support) Battalion
・ 39th Academy Awards
・ 39th Air Base Wing
・ 39th Air Division
・ 39th Airlift Squadron


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

399 Fremont Street : ウィキペディア英語版
399 Fremont Street

399 Fremont Street is a residential skyscraper under construction in the Rincon Hill neighborhood of San Francisco, California. The tower is planned to have 447 residential units on 42 floors.〔
==History==
As part of the Rincon Hill Plan adopted in August 2005, the parcels at 375 Fremont and 399 Fremont were zoned for either two residential towers, or one tower.〔 On June 15, 2006, the San Francisco Planning Commission approved the demolition of the existing buildings and the construction of a residential tower by developer Fifield Realty Corp.
Initially designed by Richard Keating Architecture, the development was approved for 432 residential units with 432 parking spaces in four underground levels. The project was marketed as The Californian on Rincon Hill by Fifield. By 2007, however, Fifield was reportedly looking to sell the development. Demolition of the existing buildings took place in February 2008.〔 In 2009, Fifield changed the name of the project to Echelon on Rincon Hill.〔(【引用サイトリンク】title=Today's "Highly Perceptive": The Californian on Rincon Hill, now Echelon on Rincon Hill?? )
After two years without starting construction, the Planning Commission granted a 12-month extension of its approvals until June 15, 2009. The extension also increased the number of allowed units to 452, while decreasing the number of parking spaces to 238. Additional 12-month extensions were granted in 2009, 2010, and 2011.〔 In 2012, developers OliverMcMillan〔(OliverMcMillan Profile )〕 and UDR acquired the project from Fifield. After being redesigned by Solomon Cordwell Buenz, another 12-month extension was granted, expiring June 15, 2013.〔 In January 2013, UDR acquired OliverMcMillan's remaining 7.5% stake in the project. The total cost of the land parcel was US$52.2 million. In December 2013, UDR announced a joint-venture agreement with MetLife to develop the US$317 million project, with UDR retaining a 51 percent ownership interest and MetLife owning 49 percent.〔
According to planning documents, the building will rise to the roof line, exclusive of mechanical screening structures, which makes the tower's total height somewhat taller.〔 Building permits were issued in June 2013. Construction began in January 2014. According to general contractor Swinerton, the project is expected to be completed by April 2016. 399 Fremont plans to feature upscale apartments and on-site amenities including fitness center, lap pool, and resident media lounge. 〔(【引用サイトリンク】url=http://www.udr.com/san-francisco-bay-area-apartments/san-francisco/399-fremont/ )

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「399 Fremont Street」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.